Forward AI Clusters · /dedicated
Managed AI clusters built around your stack.
Brazil inventory planned for May 2027.
Reserve Forward AI Clusters for your own custom software or Forward’s serving and training stack. For large workloads, our engineers customize isolated AI clusters, networking, interconnect and kernel settings—confirmed with clear terms in a written proposal.
Scope before commitment
What your quote confirms
The proposal confirms configuration, quantity, region, delivery, minimum term, costs, inclusions and operating responsibilities.
Grid operates today. Capacity in sites under development follows its own delivery and acceptance schedule.
Purchasing checklist Scope a production projectConfiguration and quantity
Specify your custom software runtime or model profile, memory, interconnect, cluster isolation and any networking or kernel customizations. State the quantity and unit. We confirm the cluster architecture in the proposal.
Region and delivery
Tell us where the workload needs to run and when it should start. Region, residency and delivery dates are confirmed per engagement.
Term and minimum
State the duration you need. Minimum capacity, minimum billed period, start of billing, renewal and cancellation belong in the written quote.
Cost and inclusions
The proposal identifies the capacity charge and any setup, storage, network, egress, licences and support charges. It states what is included and how excess usage is billed.
Operation and acceptance
Choose whether your engineers operate the workload directly or Forward runs managed serving and training—with agreed service levels, kernel/network profiles and an acceptance test.
Private requirements
If the workload needs a specific isolation or data boundary, we scope Private alongside the capacity. Controls and residency are defined in writing.
GPU-hour metering references
Rate card v1 · September 2026 · USD
A listed rate does not reserve capacity or confirm a delivery date. Configuration, quantity, region, minimum term, billing basis and inclusions are confirmed in the quote.
GPU-hour references
Dedicated inventory: Brazil, planned for May 2027. Configuration and quantities are confirmed in the quote.
- NVIDIA L4
- $0.35/ GPU-hour
- NVIDIA B200
- $7.08/ GPU-hour
Rate card v1 · September 2026 · USD. These are metering references for eligible GPU pools. A Dedicated quote confirms the GPU configuration, quantity, region, minimum term, billing basis and inclusions. A listed rate does not reserve capacity or confirm a delivery date.
Prepare with your team
Prepare a capacity brief.
Fill what you know. Carry these five requirements into a quote request.
Describe the configuration in your own words. The proposal confirms service, price and availability.
0 of 5 requirements drafted. Unanswered items are marked “To confirm” in the download.
Answers stay here while you explore the site during this visit. Refreshing clears them.